RESULTS ARE OUR
BEST REFERENCE

LONDON OVERGROUND.

TIMETABLE DESIGN AND SIMULATION FOR AN OPERATING CONCESSION BID. 

With 112 stations on several routes, the London Overground connects several suburban areas in Greater London,

Within the operating concession tender, TRENOlab was asked to prepare and test a timetable draft to be used as input.

In a few weeks, TRENOlab developed timetable drafts for several scenarios on all lines of the network, including the corresponding rolling stock rostering. Based on the performance regime define by Rfl, TRENOlab also simulated the proposed timetables, estimating the performances that would be obtained with them.

✓ Quick design of multiple timetables
✓ Rolling stock rostering
✓ Estimation of punctuality and reliability
✓ 13 routes
✓ >1000 trains/day